I sealed the cracks, let the glue dry and gave the bat a fine sanding.
As I skipped eating at lunch time (no mean feat for a fatty!) I had a break for some dinner.
In this time I left some bat wax on the blade to work its magic.
Then for the final touches, tape, re-application of the grip and a new scuff sheet.
Here is the end result.
And some indoor pictures with a bit more light.
And last but not least, the bat is back in its slip and ready to be returned to its owner.
One side note - I'm rather taken with the SafSleeve it arrived in!
I started working on this about 13.15 and finished at 21.35. I make that 8 hours, 20 minutes start to finish, with a break to attend my day job in the middle